Jurassic Fibre - Build Out
We have been assisting Jurassic Fibre with their traffic management requirements to build out their Ultrafast Full Fibre Broadband network in the South West for the past 20 months.
We have provided Jurassic Fibre with all setups ranging from No Parking Cones jobs to 4-Way Multi Phase Lights with 4 x Pedestrian Crossings.
We adapted our working model to suit Jurassic Fibre’s needs and were set up on their in-house planner to conduct the site surveys and arrange the CAD drawings, ready for the job to be scheduled and booked in.